Case Study-MEP-FP/FA BIM Modeling and Coordination Services for apartment project in BOSTON MA

Structural Modeling

Provided MEP-FP/FA BIM Modeling and Coordination Services for apartment project in BOSTON MA.

For the apartment project in BOSTON MA., we are providing MEP-FP/FA Modeling and Coordination Services for a mixed-use development featuring 3,200 square feet of retail space and 139 residential units, ensuring precise modeling and seamless coordination of all plumbing systems.

  • Project Name : Apartment project in BOSTON MA
  • Project Location : Boston, MA
  • Services Provided : MEP-FP/FA BIM Modeling and Coordination | Onsite and Off-site coordination
  • Scope: Modeling & Co-ordination
  • Client : A General Contracting Firm
  • LOD : 350/400
  • Tools : Navisworks, Revit, Procore, Tekla

     Inputs from Client

  • Revit BIM Model (Architectural and Structural)
  • Construction Documents Set
  • Equipment Spec Sheet

     Our Deliverables

  • Coordinated MEP-FP/FA Revit Model and Drawings (PDF)
  • Generate Clash Reports
  • Attend Virtual Meetings and on-site meetings
Bim modeling and Clash coordintion
Structural Modeling
Plumbing modeling
MEP-FP modleing
MEP Design
Mechanical and structural modeling Services
UNITED-BIM GOALS
  • MEP-FP/FA Modeling and Coordination
  • Clash detection and clash reports generation
  • Schedule On-site & off-site BIM coordination and meetings with the stakeholders
  • Update redlines or design mark-ups into Revit model
PROJECT BRIEF

For the apartment project in Boston, MA, which includes 3,200 square feet of retail space and 139+ residential units with in a 5-Story building, United-BIM provided comprehensive MEP-FP/FA BIM Modeling and BIM Coordination Services. This involved creating detailed Revit models with Level of Development (LOD) 350/400 and managing clash coordination to resolve conflicts between HVAC, electrical conduits, plumbing, and other building systems. The scope of work also included extensive onsite and offsite BIM coordination to ensure effective communication and integration across all project phases. As a local company with a presence in Connecticut, United-BIM has experience ranging from underground work to multi-story buildings, including those up to 5-story like this project. By leveraging Navisworks, Revit, Tekla, and Procore, United-BIM aimed to deliver an accurate, clash-free MEP-FP/FA BIM model and drawings, supporting the successful and efficient execution of the overall project development.

Project skills & expertise

Our MEP-FP modeling and clash coordination services streamlined design communication, making it easier to address errors and changes. Consistent, high-quality work with quick turnaround was delivered throughout the project, with On-site meetings significantly aiding the clash coordination process.

Top 10 Causes Of Clashes Found During Coordination

Top-10-Causes-of-Clashes-Found-During-3D-Design-Coordination-by-United-BIM.
DOWNLOAD

United-BIM performed well by delivering the final construction documents on time, which were precisely prepared and coordinated

Project Manager